2014年英语六级阅读备考训练题及答案(26)
2014-01-02 10:54:38 | 编辑:环球博海四六级  来自:网站编辑整理 
导读:阅读题型在大学英语六级中占有相当大的比重,阅读的分数却不是那么容易拿全,而每错一道题目,则相应失分也非常惨重

  阅读题型在大学英语六级中占有相当大的比重,阅读的分数却不是那么容易拿全。而每错一道题目,则相应失分也非常惨重,所以,在六级备考过程中攻克阅读难题,除了技巧之外,还需要大量的练习,在不断的练习中灵活运用技巧,提升阅读能力。环球博海四六级小编特整理了2014年英语六级阅读备考训练题及答案(26),供广大2014年的考生练习!

  In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular (标准件的) system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.

  There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.

  After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.

  After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.

  In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.

  1. The main difference between panel method and the method discussed in the last paragraph is_______.

  A. the latter uses ready-made internal features

  B. panels are cast in a level position

  C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms

  D. the former is more expensive than the latter

  2. Which of these statements is TRUE of system building?

  A. It employs more men. B. It is difficult and dangerous.

  C. It can save both time and money. D. It means less mechanization.

  3. According to the passage, the principle of system building is that_______.

  A. construction methods are safer

  B. buildings are made from a set of standardized units

  C. similar buildings can be produced

  D. all units are produced on the site

  4. The usual fixed length in the modular system is_______.

  A. twenty centimeters B. ten millimeters

  C. fifty centimeters D. ten centimeters

  5. What lifts the concrete panels onto the building?

  A. Cranes. B. Man-power.

  C. Pulleys. D. Hydraulic jacks.

  1. A 2. C 3. B 4. D 5. A

  以上是小编为2014年6月份备考的广大考生准备的英语六级阅读训练题,俗话说,磨刀不误砍柴功,重在平时积累。考生们,为了你们的通行证书,加油吧,祝你们在2014年的英语四六级考试中一举夺冠!

  环球博海四六级栏目针对广大考生学习情况特推出网络课程四六级寒假班以及6000词汇突破班等,以及环球博海四六级官方频道的YY讲堂,权威名师悉心指导,让你的学习打破常规壁垒、突飞猛进。

QQ交流群:144802801    YY讲堂:71016669  四六级微博  四六级课程推荐

更多资讯请访问 》》》博海六级考试网站
0
  • 环球博海2014春季班专题

  • 2013年12月四六级考前预测

  • 四六级寒假班蜕变计划专题

  • 环球博海网络课程专题